Facility load / grid import
78.4MW
Battery and generation output: 0 MW
Firm facility load
60.0MW
Protected workloads + essential plant
Flexible facility load
18.4MW
23.5% of current facility load
Telemetry health
99.9%
Example completeness · Last 24 hours
Site load
Facility demand at the site meter
Last hour5s samples
FirmFlexible
Last sample 13:45:00 ESTApproved import utilization
87.1%
Available response envelope
Capability at this snapshot, subject to operating limits
Deferrable computeEligible batch and training workloads
14.4 MW
Cooling adjustmentWithin temperature limits
4.0 MW
Battery import offsetSeparate from flexible facility load
6.0 MW
18.4 MW flexible load + 6.0 MW battery offset. Dispatch requires operator approval.
Battery storage
20 MW / 40 MWh
82% SOC
40% protected reserve100%
Current output0.0 MW
Modeled dispatch6 MW / 60 min
Stored energy32.8 MWh
Backup generation
4 × 6 MW units
0.0 MW output
G1
G2
G3
G4
Installed standby capacity24 MW
Excluded from the response envelope.
Economic dispatch not authorized.
Economic dispatch not authorized.